 A ship crashed into the side of this wharf at the crosshead. A ship crashed into the side of this wharf at the crosshead.
 Both piles split just below the water level. Both piles split just below the water level.
 The  broken portion was wide enough to fit an adult hand. The  broken portion was wide enough to fit an adult hand.
 Twin Line Grout Pump Twin Line Grout Pump
 Holes were drilled to insert packers. Holes were drilled to insert packers.
 Gap was grouted with a high strength (40MPa) 2-component polyurethane water tolerant resin grout. Gap was grouted with a high strength (40MPa) 2-component polyurethane water tolerant resin grout.
 Shear connectors were installed above and below the cracked portion. Shear connectors were installed above and below the cracked portion.
 Additional steel was added to strengthen the broken portion as well as to transfer the load across the weaken section. Additional steel was added to strengthen the broken portion as well as to transfer the load across the weaken section.
 All steel bars wer primed with tar epoxy, All steel bars wer primed with tar epoxy,
 HDPE permanent forms customed made for grouting to form new pile. HDPE permanent forms customed made for grouting to form new pile.
 Gaps grouted with hydraulic cementitious non shrink grout. Gaps grouted with hydraulic cementitious non shrink grout.
 After grouting. After grouting.