Scarify and remove old ashphalt Prepare to receive new road topping Weld expanded metal to main structure Replace rotted timber kerbs Lay new pre-mix
blank line
After epoxy 1st coat Completed with top coat
Replace rotted timber kerb Rotted Timber Kerb
Lower drawbridge – before Lower drawbridge – After blast & paint Lower drawbridge – Before Lower drawbridge – After
Coating in progress Working platform Completed
Resurfaced drawbridge with new timber kerb Redesign and replace drawbridge hinge. Upper drawbridge completed with new roofing
Completed Painting to control room Painting to all ancilliary buillings Cement based surfaces coated with anti carbonation system.