Kolej Komuniti Seberang Jaya had acquired 12 units 3 stories of shop lots to be converted into one of their community colleges to serve the Permatang Pauh community. During the renovations, the Main Contractor found a lot of serious defects. They informed the Client who then engaged an Engineering Consultant to conduct an investigation. Several serious defects were found but the root cause was the concrete strength was only between 6MPa to 15MPa way below the design criteria.
Summary of Repairs
- Crack injection to cracks
- Grout back honeycombed structures & loose concrete
- Enlarge 208 beams
- Construct additional 94 beams
- Enlarge 71 columns
- Waterproofing
- 12 Units of 3 Storey Shoplots. Total re-strengthening and addition of capacity
Shear connectors are most critical Additional vertical & horizontal bars as well. Typical reinforcement cage Grout used speocified for 60 MPa. Scaffolding to all beams & columns enlargement Scaffolding had to be water tight to prevent grout loss.
Typical after grouting with micro concrete completed Beams skim coated and painted looks like a normal beam